Electrical Panels for Mining: What RETIE 2026 Requires as Mining Demands More Power

Electrical Panels for Mining: What RETIE 2026 Requires as Mining Demands More Power


From January to August 2026, Colombia exported non-monetary gold worth USD 5,279.3 million, up 95.1 % from a year earlier (DANE, 5 October 2026). Behind every ounce are crushers, pumps, fans and conveyor belts running on electricity, and that power reaches them through electrical panels for mining: low and medium voltage assemblies that distribute, protect and switch the energy of a mine or a processing plant. Here is what the 2026 RETIE (Colombian electrical code, the Technical Regulation for Electrical Installations) requires and how to specify them.

Mining · RETIE 2026 · Book 3, Article 3.28.6
October 2026: mining asks for more power and more electrical safety Non-monetary gold exported, January to August 2026 (DANE, 5 Oct 2026)USD 5,279.3 M · +95.1 % Electricity demand of mines and quarries, April 2026 (XM)747.31 GWh · +22.18 % Disconnection on insulation fault (RETIE 3.28.6.2 a)1.5 s maximum Minimum IK rating at the working face (RETIE 3.28.6.4.1)IK09

Why now: according to XM, operator of the National Interconnected System, as cited by Valora Analitik (21 May) and Portafolio (22 May), mines and quarries were the segment with the biggest increase in demand in April 2026, at 747.31 GWh (Portafolio figure), 22.18 % more than in April 2025 and 33.65 % of the non-regulated market, the one served to large industry. Coal adds to the picture: exports of coal, coke and briquettes reached USD 3,343.7 million from January to August, up 8.7 % (DANE). A caution on how to read the data: in August 2026 industrial and large commercial demand fell 1.54 % (XM, report of 28 September, cited by El Norte and La FM), so electrical panels for mining are designed for the installed load, not for the peak of a single month.

What are electrical panels for mining and where are they installed?

They are switching and distribution assemblies that feed and protect the motors and equipment of a mining operation: low voltage (up to 1,000 V AC, IEC 61439) and medium voltage (switchgear cells under IEC 62271-200). They are installed in processing and crushing plants, pumping and dewatering, ventilation, belt conveying and mine substations, in open-pit or underground operations.

RETIE separates two worlds. On the surface, the general rules for installations and products apply. Underground, every mine is treated as a classified environment: Article 3.28.6.4 considers it hazardous because of the proven or possible presence of flammable or combustible gases and dusts, and it requires area classification before equipment is chosen.

What does RETIE 2026 require of electrical panels for mining?

Answer first: Article 3.28.6 of Resolution 40284 of 23 June 2026, adapted from IEC 61557-8 and NTC 6057, sets general, earthing, equipment and area classification requirements. The text in force is in the compiled RETIE from the Ministry of Mines and Energy.

What RETIE says about electrical installations in mines (Book 3, 2026)

3.28.6.1 a and bArea classification and up-to-date electrical drawings 3.28.6.1 mVisible-break disconnect near the supply 3.28.6.1 fLockout and tagout when working on a machine 3.28.6.1 h and iPortable cables certified for mining (2 kV up to 1,000 V; 5 kV from 1,000 to 4,600 V) 3.28.6.2Limiting impedance and insulation monitoring 3.28.6.3Rules for mobile substations

One practical detail: item m allows molded-case circuit breakers without a visible break, as long as it is ensured that all phases are open. That is a design decision that must be written into the specification.

Why do electrical panels for mining work with an IT system?

To reduce the arc and the ground fault current where the cable is dragged, crushed and soaked. RETIE requires supply circuits to be earthed through a limiting impedance (what it calls an IT system), with insulation monitoring that indicates earth continuity and disconnects the installation within 1.5 s at most, or raises an alarm.

1Impedance in the neutral. It is connected as close as possible to the source and sized for continuous duty, unless a ground fault trip is provided.
2Fail-safe monitoring. If the impedance opens, the source must be de-energized.
3Visible signal up to 1,000 V. A flashing light in the areas where people work: yellow below 100 Ω per volt and red below 50 Ω per volt (IEC 60364-5-53, Annex H).
4No earthing. If the system is floating, a ground fault indicator coupled to the circuit protection is required.

What IP and IK ratings should electrical panels for underground mining have?

Answer first: IP (protection against dust and water) of 20, 23, 54 or 55 depending on the location, and IK (impact resistance) of 09 at the working faces and 07 elsewhere. To read these codes on a panel, see the IP and IK ingress protection rating.

RETIE minimums for equipment in underground mines (3.28.6.4.1)

IP20Devices inside another enclosure IP23Closed rooms with no free access for personnel IP54Direct access by mining personnel IP55Intrinsically safe or increased safety equipment IK09Working faces and areas next to heavy machinery IK07Lighting, signaling, control and all other equipment

For the faces, RETIE describes the "face control boxes" (cofres de tajo): rugged panels with a welded steel enclosure and a certificate of conformity. In mines with an explosion risk they must be certified and marked IECEx or equivalent, and carry mechanical interlocks on the opening system. This is a specialized category, defined case by case with engineering.

What does RETIE require of a mobile mine substation?

A transportable, enclosed structure that is checked at every move. Article 3.28.6.3 is the part of RETIE that most resembles a checklist:

1Structure. Suitable for uneven ground or fitted with lifting means to load it onto a transport.
2Enclosure. Transformer and other components in a fully enclosed cover, or an equivalent fence or barrier at least 2 m high.
3Power. A transformer rated at least 125 % of the nameplate power of the mobile equipment it feeds.
4Earthing at every move. Measure the resistance and test the ground fault protection each time it changes location, until the maximum ground potential rise is 100 V or less.

Ectricol builds in Funza the shelter-type mobile substation, the mobile electrical substation and the shelters (prefabricated electrical rooms, assembled and tested at the factory). Each configuration should be validated against this article with the manufacturer's engineering.

Low voltage, medium voltage or both in electrical panels for mining?

Both: medium voltage carries the power to the site and to the large motors, and low voltage distributes and controls. Ectricol builds motor control centers, SIVACON S8 distribution switchboards and medium voltage switchgear cells; the rest of the family is in low voltage. For sector context, see mining.

Two site conditions change the design. Altitude: IEC 61439-1 takes 2,000 m as the normal maximum for low voltage switchboards and IEC 62271-1 takes 1,000 m for medium voltage switchgear; above those values the insulation design is agreed with the manufacturer, something to confirm if your mine is high in the mountains. And the short-circuit current, which defines the panel's Icw; it is explained in Icw, Ipk and Icc on the nameplate.

Specification lesson. Before ordering electrical panels for mining, define five data points and demand them in writing: (1) area classification and up-to-date electrical drawings (3.28.6.1); (2) a neutral earthing scheme with limiting impedance, insulation monitoring and a trip in 1.5 s or less (3.28.6.2); (3) IP and IK by zone, with IK09 at the faces (3.28.6.4.1); (4) the site's altitude, temperature and dust, together with the short-circuit current at the terminals; (5) for mobile substations, a transformer of 125 % or more and an earthing test after every move.

One boundary: this article explains the regulation and the design criteria; the nameplate values of each of the electrical panels for mining are those of its datasheet and test documentation. Industrias Ectricol S.A.S. manufactures in Funza, Cundinamarca.

Frequently asked questions

What are electrical panels for mining?

They are low and medium voltage assemblies that distribute, protect and switch the energy of motors, pumps, fans and conveyors in a mine or processing plant. In Colombia they must comply with RETIE, which sets mine-specific rules in Article 3.28.6.

What IP and IK ratings does RETIE require in an underground mine?

IP20, IP23, IP54 or IP55 depending on the location, and IK09 for equipment at working faces and next to heavy machinery, or IK07 for everything else. RETIE requires the IK rating in both classified and non-classified areas.

Why does RETIE require an IT system in mines?

To limit the arc and the ground fault current. The circuit is earthed through a limiting impedance, and insulation monitoring disconnects within 1.5 s at most or raises an alarm.

What power rating must the transformer of a mobile mining substation have?

At least 125 % of the nameplate power of the mobile electrical equipment it feeds (RETIE 3.28.6.3). It must also be in an enclosed cover or behind a 2 m barrier, and its earthing is tested at every move.

Do electrical panels for mining need explosion-proof certification?

Face control boxes in mines with an explosion risk must be certified and marked IECEx or equivalent. For the other electrical panels for mining, Article 3.28.6.4 requires classifying the areas and choosing equipment according to that study and RETIE; confirm the requirement for your case with your inspection body.

Has your mine or processing plant already defined its electrical panels for mining?

Tell us about your operation (loads, voltage, altitude, short-circuit current and whether it is surface or underground) and we will review with engineering what each Ectricol solution covers.

Talk to a specialist See the shelter-type mobile substation



________________Outstanding news

7 October, 2026

Automatic Transfer Switch Panel (ATS): How to Secure Utility-to-Generator Continuity Without Blackouts

Automatic Transfer Switch Panel (ATS): How to Secure Utility-to-Generator Continuity Without Blackouts

Picture a food plant on the Bogota plateau at 2:07 p.m. The grid drops and a clock starts running: ten seconds. An automatic transfer switch panel (ATS) is the low voltage assembly that senses the utility...

Keep reading

6 October, 2026

Ingress Protection Rating (IP) and IK: How to Read IP54, IP65 and IK10 on a Switchboard or Switchgear Nameplate

Ingress Protection Rating (IP) and IK: How to Read IP54, IP65 and IK10 on a Switchboard or Switchgear Nameplate

A switchboard labeled “IP67” may not survive a hose-down, because what was tested was immersion, and the nameplate does not even say whether it can take a hit. The ingress protection rating (the IP...

Keep reading


Terms and Conditions

Copyright © 2026 Ectricol All Rights Reserved.