By the end of March 2011, Industrias Ectricol S.A.S. visited Ormazabal's facilities in Argentina. These facilities are located in the Industrial Park of Burzaco, province of Buenos Aires.

During its visit, Industrias Ectricol toured the 5000 square meters of the plant. At this location, Ormazabal is mainly dedicated to the manufacture and installation of electrical equipment such as Transformer Substations, Primary and Secondary Distribution Cubicles and equipment for the control, protection and automation of MV electrical networks.

Likewise, products such as the miniBLOK and miniSUB, compact prefabricated transformer substations of the kiosk and subway type respectively, were found.



________________Outstanding news

1 October, 2026

Ormazabal CGM3 36 kV Switchgear: When You Need 36 kV and Why Modular

Ormazabal CGM3 36 kV Switchgear: When You Need 36 kV and Why Modular

When does a 24 kV switchgear line-up stop being enough, and when do you need 36 kV? It comes down to the service voltage of your network, and in Colombia 34.5 kV circuits are common in solar farms and...

Keep reading

30 September, 2026

Ormazabal CGMcosmos 24 kV Switchgear: The Compact Unit for Distribution Networks

Ormazabal CGMcosmos 24 kV Switchgear: The Compact Unit for Distribution Networks

When a distribution network runs at 24 kV or below, the CGMcosmos 24 kV switchgear from Ormazabal is one of the most widely used answers for secondary switchgear: compact, gas-insulated and modular. This...

Keep reading