Electrical solutions for the world

Electrical solutions for the world


Ectricol proudly presents its international participation in the manufacture of integral solutions for the Utilities sector; these are 4 power centers designed and manufactured according to the specifications and needs of the client. These centers will be transported and installed in Rio Tolten, a river that crosses part of the southern zone of Chile from east to west, located in the Province of Cautin, IX Region of the Araucania.

These solutions were developed for GRUPO SAESA (Sociedad Austral de Electricidad Sociedad Anónima for its Spanish acronym), a leading company in the utilities sector with more than 78 years of experience within the electrical industry. Ectricol was chosen as the company best qualified to carry out this project, which highlighted the quality, engineering and innovation of our power centers built and designed to house their electrical equipment.

During an exhaustive period and with the most talented professionals and technicians we executed the project in record time in order to manufacture these solutions that have the following special characteristics.

Characteristics:

  • One shelter of 14 m long by 3.5 m wide and with a height of 4.07 m.
  • Two shelters of: 12 m long by 3.5 m wide and with a height of 4.07 m.
  • One shelter of: 3.0 m long by 3.5 m wide and with a height of 4.07 m./li>
  • Compliant with the Chilean earthquake-resistant regulations.
  • Fire detection system.
  • External, internal and emergency lighting system.
  • Gable roof with a 17 degree slope.
  • External gutter and downspout system.
  • • IP65 protection degree.


  • Learn more about our solutions.



________________Outstanding news

9 October, 2026

Battery Energy Storage: What Chile Teaches About Switchgear and Switchboards for BESS

Battery Energy Storage: What Chile Teaches About Switchgear and Switchboards for BESS

According to Chile's national grid operator, the Coordinador Eléctrico Nacional (CEN), on 28 August 2026 the country had close to 5,000 MW of batteries on its system, 2,700 MW of them in commercial...

Keep reading

8 October, 2026

Electrical Panels for Mining: What RETIE 2026 Requires as Mining Demands More Power

Electrical Panels for Mining: What RETIE 2026 Requires as Mining Demands More Power

From January to August 2026, Colombia exported non-monetary gold worth USD 5,279.3 million, up 95.1 % from a year earlier (DANE, 5 October 2026). Behind every ounce are crushers, pumps, fans and conveyor...